Thursday, August 21, 2014

Newsletter Update 9

Newsletter Update 9



Garage Repairs

Mobilization will start at the end of August beginning of September. The Project will take approximately four months. Landscaping may have to wait until 2015. Traffic on B1 and B2 may be affected however every effort to minimize delays will be made. Scope of work: The membrane will be replaced and any areas of faulty concrete will be removed and repaired. Contractors: Intragreen Roofing Systems Inc. and Cion Engineering will manage the repairs.

The Areas of Repair:
(click on the image to see full size map)





Sidewalk

We will be holding a Meeting in September to pass a By-Law for the Sidewalk. The City will build the sidewalk (Zero Cost to PCC239). The City will maintain the sidewalk (Zero Cost to PCC239).

Party Room Renovation

 
The Party Room will be renovated this year which will take approximately two months.

Party Room Rental During Renovation
 
The Library area on the G Level will be an option for Rent should any resident want to have a small get-together. This area will not be used for full on parties or for any event that will require loud music. The room can be rented until 11:00pm. The cost of rental is $50.00.

Painting - Garbage Area
 
The Garbage Room will be painted. Please help in keeping this area looking clean.

Painting - B1 and B2 Parking Spots

Spots in the B1 and B2 area will be painted. Painting will be based on the condition of the parking spot and whether concrete work will be required.

Bicycles

Bicycles that are not registered will be removed.

Annual Flowers

Due to the construction the annual flowers were not planted at the front of the building. The Landscaping Company indicated that a lot of money was wasted about three years ago when annuals were planted and then had to be removed for construction work.

Hand Sanitizers (New)

Hand sanitizers have been installed on each floor near the garbage disposal. 

Lights LED (New)

Lights are being installed at the side of the building and at the front of the garage entrance. This will provide illumination and added safety.

Foosball (New)
 

We now have a Foosball Table in games room. Please enjoy.

Basketball (New)

We now have a Basketball Ring on the Tennis Court. Please enjoy. Remember the court booking rules apply.

Gym (New)

We will be installing a sitting bench press in the Gym. This equipment is very user friendly and can be used by all ages. Kettle Bells, Step Board, Wobble board, Boxing Bag, Chin-up bar and lower ab leg lift. Please make use of the gym.

Lounge Chairs (New)

We have two new lounge Chairs at the back of the building. Enjoy some time in this area. It is our prized possession.

Cameras

Over the next coming months Cameras will be installed at all exits/entrances to the building. This way security will be able to monitor the entire building from their station.

Garbage Bins (New)

New garbage bins have been installed throughout the building. These bins are for light Trash and not heavy garbage.

BBQ Area

There is an extra BBQ so that more families can have fun. Please book the BBQ and leave a $20.00 deposit with security (money will be refunded). Kindly clean BBQ after use.

Car Wash Bay (New)

We now have a brush and bucket available for washing your car. Please inquire at Concierge.


Volunteers for helping Senior Residents (Internal Window Cleaning)

Windows will be taken off the track, cleaned and put back in. We are looking for Volunteers: Pleas sign up at the Concierge.

YOGA and ZUMBA

YOGA:   is now held Weekly (Monday’s Radha and Tuesday’s Camelia)
ZUMBA: is now held Weekly on a Trial Basis (Fridays)

Note: These activities will continue once there is a need. If residents are not taking advantage of the service the activities will be discontinued. There should be at least five people in each session to maintain the activity.