Air Condition Update

 Air Condition Update

Dear Residents,

Repairs to the “03” and “05” Line have been completed.

The lines will be pressurized on May 26th evening, which will take 5 hours to complete.

The Air Condition System will be started up early Thursday Morning, May 27th.

Thank you for your understanding and support of these much need repairs and we do apologize for the inconvenience.

Simsons Management

Thursday, May 20, 2021

Air Condition Start Up

 Air Condition Start Up


Dear Residents,

Preparations to start up the A/C was started in early May and necessary repairs have been completed. The Chiller will be on Test until Tuesday morning and the system will be drained to accommodate repairs to two pipes on the “03” line.

Once these repairs are completed, the system will be re-started.

- Please set your A/C thermostat to 23 degrees
- Ensure that you have a new filter as this will improve air quality

Water will be shutdown on Tuesday May 25th from 9am to 5pm to accommodate repairs to the “03" line. 

Should the repairs be completed ahead of schedule, the water will be switched back on.