Saturday, July 25, 2015

Newsletter Update 16A

Newsletter Update 16A



Garage repairs progress report  

- Structural Engineers CION has marked out areas on the top slab to be repaired
- Contractors will start the process of removing damaged concrete and prepare the area to pour new concrete

Noise alert

- Removal of concrete requires the use of Jack Hammers which will produce loud noises

Access to B1 and B2


- Access to the B1 and B2 will be restricted for safety over the next three-four weeks
- Starting Monday 27th 2015 at 9:00am there will be limited access to B2. Time: 9:00am - 4:00pm
- Residents can park temporary in the visitors parking
- This will only be necessary when drilling is being done on the top slab
- Notices will be posted

Parking

- Residents who have been asked to park in visitors parking will be assigned temporary parking spots. A reserved sign will be placed next to the tennis court with your vehicle number displayed. Please park in your designated spot.

Place Royale Board of Directors thanks all residents for their continued support in improving our property.

Tuesday, July 14, 2015

Newsletter Update 16

Newsletter Update 16


Garage Repairs

Place Royale Board of Directors would like to thank our community for their patience and cooperation as the Garage repairs continue.

Progress Report

 
- The contractors have completed approximately 25% of the work and the project is exactly on schedule.

- Concrete slab surface in front of the building has been cleared of debris and will go through a final clean; concrete integrity will be tested.

- Structural Engineers CION will provide feedback and restoration will commence followed by application of new waterproofing membrane.

- The first area of focus will be the front entrance; more specifically the area under the canopy at the front door. During reconstruction of this area the front door will be locked for safety. Residents and visitors can access the building from the West Side door.

- The front entrance will be reserved for emergency crews only. Security personnel will be instructed to closely monitor the West Side door for unauthorized access.

- The ramp to the B2 level will be reduced to one lane only due to necessary concrete slab restoration in this area; proceed with extreme caution; speed limit 5km/h.

- Exercise caution when entering and exiting the garage as heavy equipment will be operating in the wash bay area.

NOTE: Families with small children that use strollers, persons using wheelchairs will need to be escorted by Security through the front entrance if the ramp is available; alternatively one will need to exit the building through the garage. In booth cases they will need Security escort. Please contact Security for assistance. 

Place Royale Board of Directors thank all residents for their continued support in improving our property. Thank you.